Track renewal equipment 



Strukton Rail deploys track renewal equipment for laying and overhauling sleepers and rails.
 


P95 track renewal train

The use of track renewal train allows the sleepers and rails to be replaced in one working process.

Sleeper train 1

This sleeper train can be used for track renewal machines, such as the P90 Matisa and the P95 Matisa.

Sleeper train 2

This sleeper train is used in combination with the P95 Matisa, Strukton Rail's renewal train 2. The gantry cranes of the renewal train run along rail tracks with a railway gauge of 2806 mm, which are mounted to the wagons.

PTH-350 gantry cranes

The PTH-350 gantry cranes are used for removing or laying rail sections of approximately 30 metres.

Ballast tip wagon

De Grindkipper is een machine die zich over het spoor kan voortbewegen en ongeveer 10 ton grind mee kan nemen. Dit kan die gedosseerd lossen in het spoor.