This sleeper train is used in combination with the P95 Matisa, Strukton Rail's renewal train 2. The gantry cranes of the renewal train run along rail tracks with a railway gauge of 2806 mm, which are mounted to the wagons.
60 Sleepers can be stacked on the wagons, in packets of 30 pieces each, in 3 levels high. This enables the sleeper train to transport 180 NS90 sleepers per wagon.
The wagons can also be used for other purposes if desired, e.g. for transporting rail sections.
Characteristics
|
Manufacturer |
On Rail |
|
Type |
Sps UIC / RIV |
|
Number |
20 |
|
Total mass |
empty 25.51 tons, loaded max 80 tons |
|
Length between buffers |
18,900 mm |
|
Number of axles |
4 |
|
Maximum load |
up to 180 NS90 sleepers |