This sleeper train was originally used in combination with the P90 Matisa (Strukton Rail's renewal train 1). The sleeper wagons can also be used in combination with the Matisa P95 Matisa (Strukton Rail's renewal train 2), in which case the cranes and crain rail of this machine must be modified. This takes approximately one day.
The gantry cranes of the renewal trains run along rail tracks with a railway gauge of 2930 mm, which are mounted to the wagons.
54 sleepers can be stacked in 3 levels on the wagons.
The wagons can also be used for other purposes if desired, e.g. for transporting track sections.
Characteristics
|
Fabrikant |
Knape Spoorbouwtechniek Kirchmoser |
|
Type |
SMPs 251a UIC / RIV |
|
Number |
17 |
|
Total mass |
leeg 25,15 tons, loaded max 80 tons |
|
Length between buffers |
18,900 mm |
|
Number of axes |
4 |
| Maximum load |
up to 198 NS90 sleepers |