progress bar loading...

P95 track renewal train 




The track renewal train is capable of replacing sleepers and rails in a single process. It is equally suitable for replacing sleepers only. New sleepers are brought in and old sleepers removed by one or two gantry cranes. The gantry cranes carry 30 sleepers on each trip, and work in conjunction with special sleeper wagons.
The machine is able to handle wood, concrete and steel sleepers.

General information

 

Manufacturer

Matisa

Type

P95

Quantity

1

Total weight

310 tons

Length over the buffers WKE.WES.WM.WF.WMM

110.980 mm

Number of axles

18 + 1 support + 1 extra axle

Engine power

450 kW

Max. self-propelled speed

5 km/h

Max. speed in train

100 km/h

 

 

Performance characteristics 

 

Working rate

up to 350 m1 per hour

 

Connected Products & Services 

Track renewalPTH-350 gantry cranes